Google
      
发新话题
打印

军机第一贴,1985年军机USS BREMERTON(SSN 698)

军机第一贴,1985年军机USS BREMERTON(SSN 698)









USS Bremerton (SSN 698)

USS BREMERTON is the 11thLOS ANGELES class nuclear powered attack submarine and the 6th boat in this class built by Electric Boat in Groton, CT.

On March 11, 1999, USSDAVID R. RAY(DD 971), along with USS BREMERTON, was tasked by the Navy with sinking the commercial tanker NEW CARISSA at the request of a unified command made up of local, state and federal officials concerned about the environment. The NEW CARISSA had been spilling oil since it shipwrecked near Coos Bay, OR, on February 4. It was then towed for three days to the open ocean for sinking. This effort was the unified command's second attempt to dispose of the 6,000-ton hulk, which had broken free from another tow a week earlier, only to return ashore along the central Oregon coast. An estimated 130,000 gallons of thick crude oil remained in the ship's fuel tanks after Navy Explosive Ordnance Disposal Mobile Unit 11, from Whidbey Island, WA, torched more than half of the hazardous material February 10.DAVID R. RAYgunners prepared point-detonating 5-inch, 54-caliber projectiles for firing into NEW CARISSA to facilitate flooding. The destroyer's gunners then pumped 69 rounds into NEW CARISSA's bellowing hull. As intended, the resulting punctures allowed trapped air to ventilate. Strategically placed shots along the waterline caused the desired stern-first submersion that achieved the intended outcome. BREMERTON was then called upon to fire one Mk-48 advanced capability torpedo, sinking NEW CARISSA.
General Characteristics:Awarded:January 24, 1972
Keel Laid:May 8, 1976
Launched:July 22, 1978
Commissioned:February 28, 1981
Builder:Electric Boat Division of General Dynamics Corporation, Groton, CT
Propulsion system:one nuclear reactor
Propellers:one
Length:360 feet (109.73 meters)
Beam:33 feet (10 meters)
Draft:32,15 feet (9.8 meters)
Displacement:Surfaced: approx. 6,000 tons
Displacement:Submerged: approx. 6,900 tons
Speed:Surfaced: approx. 15 knots
Speed:Submerged: approx. 32 knots
Armament:four 533 mm torpedo tubes forMk-48torpedoes,Harpoonmissiles
Cost:approx. $900 million
Crew:12 Officers, 115 Enlisted

官方的介绍www.bremerton.navy.mil/

USSBremerton(SSN 698) is named forBremerton, Washington, the home of the Puget Sound Naval Shipyard. She is the second naval warship to bear the name of that city.Bremertonrepresents a significant element of the United States, she is the first flight of 688 class fast attack submarines. Powered by a pressurized-water cooled reactor, and equipped with the most advanced sonar and weapons delivery system, she stands ready to maintain world peace and keep our sea lanes open. Manned by a highly trained and dedicated crew,Bremertonhas truly established herself as "First Flight Tough" whose reputation for excellence is unsurpassed.
Our crew never forgets what the ships moto states"Stand ready to serve our country"


BremertonInformation

Commanding Officers

CDR T. A. Zwolfer, USN

December 2005 - Present

CDR C. J. Logan, USN

November 2002 - December 2005


CDR B. K. Nutt, USN

August 2000 - November 2002

CDR R. L. Thomas, USN

May 1998 - August 2000

CDR R. R. Cox, USN

May 1995 - May 1998

CDR J. M. Crochet, USN

August 1992 - May 1995

CDR L. A. Hughes, USN

March 1990 - August 1992

CDR J. C. McMacken, USN

February 1988 - March 1990

CDR A. R. Beam, USN

January 1985 - February 1988

CDR D. S. Wright, USN

May 1982 - January 1985

CAPT T. H. Anderson, USN

March 1981 - May 1982


Ship Statistics

Keel Layed

08 May 1976

Launched

22 July 1978

Commissioned

28 March 1981

Length

360 Feet

Beam

33 Feet

Displacement

6900 Tons

Complement

128 Enlisted
14 Officers




美国USS Bremerton号(SSN 698)潜艇在靠近珍珠港的太平洋洋面上,为USS Port Royal号(CG 73)上来访的中国高级官员表演潜艇紧急上浮。一天后,三艘中国舰艇抵达珍珠港进行访问。


[ 本帖最后由 david 于 2008-3-3 22:47 编辑 ]

TOP

传说中的SSN 698,不错呀,可惜就是屁股花了,看不清呀!/:b

TOP

屁股是85年的。。。。

TOP

发新话题